DOI: https://doi.org/10.38043/telsinas.v5i2

Published: 2022-09-25

DOI: https://doi.org/10.38043/telsinas.v5i2.3805

Analisa Deskriptif Keterlambatan Pekerjaan Proyek Konstruksi Eto Tower Dili, Timor-Leste

I Komang Agus Ariana, Dewa Ayu Putu Adhiya Garini Putri, Messias Da Costa Boavida

105-111

DOI: https://doi.org/10.38043/telsinas.v5i2.4111
DOI: https://doi.org/10.38043/telsinas.v5i2.4112

Analisa Kecelakaan Lalu Lintas di Ruas Jalan Bypass Ngurah Rai Kota Denpasar

I Gusti Ngurah Nyoman Wismantara, Nengah Riana, Yanuarius Reinaldi Nenta

122-131

DOI: https://doi.org/10.38043/telsinas.v5i2.4113
DOI: https://doi.org/10.38043/telsinas.v5i2.4119
DOI: https://doi.org/10.38043/telsinas.v5i2.4128

Perancangan Sistem Informasi Manajemen Tugas Akhir Pada Institut Informatika Indonesia Menggunakan Metode Incremental

Raymond Sutjiadi, Alexander Wirapraja, Edwin Meinardi Trianto, Titasari Rahmawati , Rizky Basatha, Briantito Adiwena, Andreas Krisopras

152-164

DOI: https://doi.org/10.38043/telsinas.v5i2.4334
DOI: https://doi.org/10.38043/telsinas.v5i2.4336