Analisa Deskriptif Keterlambatan Pekerjaan Proyek Konstruksi Eto Tower Dili, Timor-Leste
DOI:
https://doi.org/10.38043/telsinas.v5i2.4111Keywords:
Project Delays, ConstructionAbstract
In general, every implementation of a construction project there is always a work delay. The delay in this work has an impact on the implementation of the Eto Tower construction project in Dili, Timor-Leste which will be carried out in January 2020 to January 2021, but has been delayed. Thus, the purpose of this study is to describe what causes delays in the Eto Tower construction project. Descriptive statistical analysis was used in this study. Where the number of samples is 33 employees which is the entire population. The results of this study indicate that the main causes that affect the delay in the Eto Tower construction project are environmental factors with a mean value of 27.24, lack of materials and materials with a mean value of 26.85 and the cause of equipment with a mean value of 26.67. Support from the local community in the project is needed.
References
Indra Khaidir. (2019). Faktor Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi Di Sumatera Barat. Jurnal Rekayasa, 8(1), 32–49.
Ronald Simanjuntak, M. A., & Sinta Suawa, S. (2014). Menganalisa Sistem Manajemen Dan Pengaruhnya di Dalam Kinerja Operasional Di Perkantoran. Jurnal Ilmiah Media Engineering, 4(2), 92–102. https://ejournal.unsrat.ac.id/index.php/jime/article/view/6076
Amalia, R., Rohman, M. A., & Nurcahyo, C. B. (2012). Analisa Penyebab Keterlambatan Proyek Pembangunan Sidoarjo Town Square Menggunakan Metode Fault Tree Analysis ( FTA ). Institut Teknologi Sepuluh Nopember, Surabaya, 1(1), D20–D23.
Asmi, A., & Pratama, J. C. S. (2016). Identifikasi Faktor-Faktor Keterlambatan Dalam Proyek Konstruksi Di Jakarta. Jurnal, November, 1–12.
Astina, D., Widhiawati, I., & Joni, I. (2012). Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Pekerjaan Proyek Konstruksi Di Kabupaten Tabanan. Jurnal Ilmiah Elektronik Infrastruktur Teknik Sipil, 1999.
Darmawan, D. (2019). Analisis Data Statistik Deskriptif. Journal of Chemical Information and Modeling, 53(9), 1689–1699.
Ervianto, W. I. (2005). Manajemen Proyek Konstruksi (Edisi Revisi). Yogyakarta: Andi. Hartanto, D. (2019). Pengaruh Kompetensi Guru, Motivasi Belajar, Metode Mengajar DanFasilitas Belajar Terhadap Prestasi Belajar Siswa (Studi Pada Mi Baitussalam Betiring Kec. Cerme). Universitas Muhammadiyah Gresik.
Indra Khaidir. (2019). Faktor Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi Di Sumatera Barat. Jurnal Rekayasa, 8(1), 32–49.
Ir. Sugiyanto, M. M. T. (2020). MANAJEMEN PENGENDALIAN PROYEK. SCOPINDO MEDIA PUSTAKA.
Kusmaran, K. (2021). ANALISA FAKTOR KETERLAMBATAN PEKERJAAN PROYEK (Studi Kasus?: Pembangunan Rawat Inap Puskesmas Sungai Guntung Kec. Kateman Kab. Inhil Tahun Anggaran 2017). Stmj (Structure Technology Management Journal),1(1), 15.
Pinori, M., Mickson.Pinori@Gmail.com, Manado, M. P. S. U., B.F.Sompie, Staf Pengajar JurusanTeknik Sipil, P. S. U. M., Willar, D., & Staf Pengajar JurusanTeknik Sipil, P. S. U. M. (2015). Analisis Faktor Keterlambatan Penyelesaian Proyek Konstruksi Gedung Terhadap Mutu, Biaya Dan Waktu Di Dinas Pekerjaan Umum Kota Manado. Ilmiah Media Engineering, 5(2), 401–405
Siswanto, A. B., & Salim, M. A. (2019). Manajemen Proyek. CV. Pilar Nusantara. Sitanggang, N., Simarmata, J., & Luthan, P. L. A. (2019). Pengantar konsep manajemenproyek untuk teknik. Yayasan Kita Menulis.
Sugiono. (2013). Metode Penelitian Pendidikan Pendekatan Kuantitatif,Kualitatif,dan R&D.Alfabe
Ul’fah Hernaeny, M. P. (2021). POPULASI DAN SAMPEL. Pengantar Statistika 1, 33.
Widhiawati, I. A. R. (2009). Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi. Majalah Ilmiah Teknologi Elektro, 11(2).
Wijayanthi, S., Joko, T., Adi, W., Indriyani, R., Studi, P., Manajemen, M., Keahlian, B., Proyek, M., & Pascasarjana, P. (2007). Analisa Faktor Penyebab Keterlambatan pada Bangunan Tinggi di Surabaya. Faktor – Faktor Penyebab Keterlambatan Waktu Pembangunan Proyek Gedung Negara Di Lingkungan Pemerintah Kota Kediri, 1–8.
Wirabakti, D. M., Abdullah, R., & Maddeppungeng, A. (2014). Studi Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Bangunan Gedung. Teknik Sipil Universitas Agung Tirtayasa, Vol. 6,
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 agus ariana
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.