Analisis Konstruksi Posisi Lightning Arrester Di Gardu Distribusi Km 0003 Penyulang Subagan Wilayah Kerja PT PLN (Persero) ULP Karangasem

I Made Asna, I Wayan Suriana, I Wayan Sugarayasa, Wayan Sutama, I Wayan Dikse Pancane, I Nyoman Gede Adrama, I Made Sariana

46 -55

DOI: https://doi.org/10.38043/telsinas.v4i1.2143

Analisis Perbandingan Penjadwalan Menggunakan Critical Path Method (CPM) dengan Precedence Diagram Method (PDM) (Studi Kasus : Proyek Pembangunaan SD Negeri 5 Pecatu)

Komang Agus Ariana, Ketut Nuraga, Putu Budiarnaya, Putu Ariawan, I Gusti Ngurah Nyoman Wismantara, Nengah Riana, Kadek Pasek Pangestu

56 - 61