Maximum Analysis of Human Resource Availability Units in the Construction of the Banjar Wongaya Betan Tabanan Multipurpose Center
Main Article Content
Abstract
Human resources are very important in the implementation of construction projects. Improper allocation of human resources can lead to overallocation of human resources, which reduces work productivity. In the time schedule report for the realization of the Banjar Wongaya Betan Multipurpose Hall Development Project in Tabanan Regency, there was a discrepancy between the actual progress and the planned progress, resulting in delays in implementation. Based on these issues, research was conducted to determine the comparison between the maximum unit requirements and availability before and after Resources Leveling was carried out using Microsoft Office Project 2019. Based on the analysis results, it was found that the number of human resources that were initially over-allocated could be optimized after the leveling process was carried out using the resources leveling method with Microsoft Office Project 2019. The total human resource requirements and availability, which were initially 48.26 people and 37 people, became 32.13 people and 37.00 people after leveling, which means that human resources are sufficient for project implementation. The leveling results data can be used as evaluation material and benchmarks for subsequent projects.
Article Details

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
References
I. G. P. Wahyu Guna and K. A. Ariana, “Analisis Percepatan Waktu Pelaksanaan Proyek Terhadap Rencana Anggaran Biaya Pada Proyek Pembangunan Kantor dan Gedung Serbaguna Polresta Denpasar,” J. Ilm. Telsinas Elektro, Sipil dan Tek. Inf., vol. 3, no. 2 SE-, pp. 9–12, Feb. 2021.
T. I. Praganingrum, N. L. M. A. M. Pradnyadari, A. A. R. R. Wangsa, and N. M. I. W. Renita, “Analisis Penyediaan Sumber Daya Manusia yang Optimal terhadap Waktu Penyelesaian Proyek pada Proyek Konstruksi,” J. Tek. Gradien, vol. 16, no. 01, pp. 1–8, 2024.
I. G. N. Sunatha, A. A. R. R. Wangsa, T. I. Praganingrum, and I. N. S. Widana, “Analisis Durasi dan Biaya dengan Metode Resources Leveling pada Pembangunan Balai Serbaguna Banjar Wongaya Betan Tabanan,” Widya Tek., vol. 19, no. 2, pp. 47–53, 2024.
Nurhayati, Manajemen Proyek. Yogyakarta: Graha Ilmu, 2010.
H. Larson yang diterjemahkan oleh Dimyati and K. Nurjaman, Manajemen Proyek Pustaka Setia. Bandung, 2014.
I. G. N. Sunatha and I. P. Y. Hermawan, Modul Kursus Microsoft Project. Denpasar: Fakultas Teknik Universitas Mahasaraswati Denpasar, 2020.
D. K. Ahadzie, D. G. Proverbs, and P. O. Lomolaiye, “Critical Success Criteria for Mass House Building Projects in Developing Countries,” Int. J. Proj. Manag., 2007.
A. Ashworth, Perencanaan Biaya Bangunan. Jakarta: PT Gramedia Pustaka Utama, 1994.
O. Widiantoro, Buku Ajar Rencana Anggaran Biaya (Contruction Cost Estimate). Surabaya: Jurusan Teknik Sipil Fakultas Teknik Universitas Negeri Surabaya, 2017.
Y. Muzayanah, “Pemodelan Proporsi Sumber Daya Proyek Konstruksi,” Tesis. Magister Teknik Sipil Universitas Diponegoro: Semarang, 2008.
A. Husen, Manajemen Proyek (Perencanaan, Penjadwalan, dan Pengendalian Proyek). Yogyakarta: Andi, 2009.
I. Soeharto, Manajemen Proyek (Dari Konseptual Sampai Operasional). Edisi Kedua. Jilid 1. Jakarta: Erlangga, 1999.
N. P. L. M. Yanthi, “Analisis Pengaruh Percepatan Waktu Pelaksanaan Terhadap Biaya Dengan Metode Fast Track Berbasis Software Microsoft Project,” Skripsi. Fakultas Teknik Universitas Mahasaraswati: Denpasar, 2022.
M. I. Maromi and R. Indryani, “Metode Earned Value untuk Analisa Kinerja Biaya dan Waktu Pelaksanaan pada Proyek Pembangunan Condotel De Vasa Surabaya,” J. Tek. ITS, vol. 4, no. 1, 2015.
R. P. Kelana, “Optimalisasi Penggunaan Sumber Daya Manusia,” J. Fak. Tek. Univ. Sebel. Maret Surakarta, 2010.
S. Male, “Resource Optimization Explained for Beginners,” Runn, 2022. https://www.runn.io/blog/resource-optimization (accessed Apr. 25, 2023).
N. Tiefensee, “What is Overallocation of Resources & How to Avoid It,” Runn, 2022. https://www.runn.io/blog/resource-overallocation (accessed Apr. 25, 2023).