1.
Ritaka Wangsa AAR, Mirayani Pradnyadari NLMA, Sapta Widana IN. Maximum Analysis of Human Resource Availability Units in the Construction of the Banjar Wongaya Betan Tabanan Multipurpose Center. telsinas [Internet]. 2025Sep.9 [cited 2025Sep.13];8(2):145-54. Available from: https://journal.undiknas.ac.id/index.php/teknik/article/view/6941