Kresna, I. P. K. S., Tapa, I. G. F. S. and Sutapa, I. K. (2026) “Analysis of Delay Factors Leading to Contract Disputes in Construction Projects: A Case Study of Badung Regency”, Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi, 9(1), pp. 48-60. doi: 10.38043/telsinas.v9i1.7589.