Erlangga, Raihan Prameswahra, Usman Usman, and Achmad Chair. 2025. “Design and Build Thermo Electric Hybrid Power Plant As AGL CBT Laboratory Backup Power Supply ”. Jurnal Ilmiah Telsinas Elektro, Sipil Dan Teknik Informasi 8 (2):202-9. https://doi.org/10.38043/telsinas.v8i2.6995.