Ritaka Wangsa, Anak Agung Ratu, Ni Luh Made Ayu Mirayani Pradnyadari, and I Nengah Sapta Widana. 2025. “Maximum Analysis of Human Resource Availability Units in the Construction of the Banjar Wongaya Betan Tabanan Multipurpose Center”. Jurnal Ilmiah Telsinas Elektro, Sipil Dan Teknik Informasi 8 (2):145-54. https://doi.org/10.38043/telsinas.v8i2.6941.