Kresna, I. P. K. S., Tapa, I. G. F. S., & Sutapa, I. K. (2026). Analysis of Delay Factors Leading to Contract Disputes in Construction Projects: A Case Study of Badung Regency. Jurnal Ilmiah Telsinas Elektro, Sipil Dan Teknik Informasi, 9(1), 48-60. https://doi.org/10.38043/telsinas.v9i1.7589