[1]
Maw, M.M., Putra Atmaja, S.K.R. and Murtika, I.W. 2025. Evaluating Contractor Performance through Cost-Time Management Strategies in Educational Building Project. Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi. 8, 1 (Apr. 2025), 58-63. DOI:https://doi.org/10.38043/telsinas.v8i1.6229.