Wiraningsih, P. I. P. (2024). Analisis Reduksi Durasi Proyek Metode Crashing Dengan Penambahan Waktu Kerja (Studi Kasus: SDN Werdi Bhuwana). Reinforcement Review in Civil Engineering Studies and Management, 3(2), 94-108. Retrieved from https://journal.undiknas.ac.id/index.php/reinforcement/article/view/6454