Kajian Biaya Perjalanan Akibat Tundaan Lalu Lintas di Ruas Jalan Hasanuddin Denpasar

Authors

  • Putu Budiarnaya Universitas Pendidikan Nasional
  • Adelino Sia Babo Amaral Universitas Pendidikan Nasional
  • Gusti Wismantara Universitas Pendidikan Nasional

DOI:

https://doi.org/10.38043/telsinas.v4i2.3336

Keywords:

road segment performance, congestion costs, time value

Abstract

The impact of traffic volume and the presence of side obstacles on the Hasanuddin road section causes travel delays which result in a decrease in travel time and has an impact on the time value of vehicles and Vehicle Operational Costs (BOK) that pass on these roads. The purpose of this study is to analyze the performance of the road and the travel costs that occur with delays caused by side obstacles on Jalan Hasanuddin Denpasar. The calculation of BOK for cars uses the method from the Ministry of Public Works in 2005. Meanwhile, the calculation of BOK for motorcycles adheres to the DLLAJ method for the Province of Bali – PTS Consultant 1999. The results of this study are: 1) The performance of Hasanuddin Road is: Traffic volume during peak hours in the morning 1,470.6 junior high school/hour, the afternoon peak hour is 1,346.4 pcu/hour and the afternoon peak hour is 1,425.1 pcu/hour. The road segment capacity is 2,999.8 pcu/hour at peak hours in the morning, afternoon, and evening. The speed of light vehicles at the peak hour in the morning is 13.66 km/hour, the peak hour in the afternoon is 14.32 km/hour and the peak hour in the afternoon is 12.63 km/hour. The degree of saturation is 0.490 for the morning peak hour, 0.449 for the afternoon peak hour and 0.475 for the afternoon peak hour. 2) Travel costs without traffic delays on Jalan Hasanuddin Denpasar at peak hours in the morning IDR 474,442.79, afternoon IDR 477,814.01, afternoon IDR 474,310.83 with a total amount of 1,426,547.63, then there is a delay on Hansauddin Road, morning peak hours 0.0138 hours, Afternoon 0.0141 hours, afternoon 0.0135, so for Traffic Travel Costs due to traffic delays on Jalan Hasanudin Denpasar it increases at peak hours in the morning, IDR 480,969.82 in the afternoon IDR 484,551.19, afternoon IDR 480,714.02 with an amount of IDR 1,446,235.04 at peak hours

References

Badan Pusat Statistik Kota Denpasar 2020 Data Jumlah Kepemilikan Kendaraan. Tersedia https://denpasarkota.bps.go.id. Diakses tanggal 9 Agustus 2020

Badan Pusat Statistik Kota Denpasar 2020 Data Jumlah Penduduk Kota Denpasar. Tersedia https://denpasarkota.bps.go.id. Diakses tanggal 9 Agustus 2020

Departemen Pekerjaan Umum,1997. Manual Kapasitas Jalan Indonesia. Dirjen Bina Marga

Departemen Pekerjaan Umum. 2005. Pedoman Perhitungan Biaya Operasi Kendaraan untuk biaya tidak tetap (running cost).

Google Inc.2020 Google Maps : Peta Lokasi Jalan Hasanuddin Denpasar Denpasar dalam http://maps.google.com/ Google Inc.2020 Google Maps : Peta Lokasi Kota Denpasar dalam http://maps.google.com/

Google Inc.2020 Google Maps: Peta Lokasi Pulau Bali dalam http://maps.google.com/

Indrayana, I. G. N. G. A., Wedagama, D.M.P., Suparsa, I. G. P. 2013. Analisis Kinerja Ruas Jalan Dan Biaya Perjalanan Akibat Tundaan Pada Ruas Jalan. Volume: 2 Nomor 2. Jurnal Ilmiah Elektronik Infrastruktur Teknik Sipil.

Kinerja Ruas Jalan Perkotaan Jalan Prof Dr. Satrio, DKI Jakarta. (2009). Journal of Regional and City Planning, 20(3), 21 5–230.(Koloway, 2009)

PCI, 1979. Pasific Consultant International . PT.Bina Marga

PDRB, 2015/2019. Badan Pusat Statistik Kota Denpasar. Produk Domestik Regional Bruto Denpasar (PDRB) 2015/2019.

PTS, Pem. Prov. Bali, DLLAJ.1999. Public Transport Studi (PTS) Household and Roadside Surveis, Bali Urban Infrastructure Project.

Downloads

Published

2022-10-03

How to Cite

1.
Budiarnaya P, Sia Babo Amaral A, Wismantara G. Kajian Biaya Perjalanan Akibat Tundaan Lalu Lintas di Ruas Jalan Hasanuddin Denpasar. TELSINAS [Internet]. 2022Oct.3 [cited 2024Mar.29];4(2):106-9. Available from: https://journal.undiknas.ac.id/index.php/teknik/article/view/3336

Issue

Section

Articles